Starlink · Audio visual · Appliance installationgary@summit-comms.com
HomeSummit installation services

Appliance installation in Perth

Washing machine and suitable plug-in appliance setup using compatible existing services, with careful positioning and checks before handover.

The installation

What we consider.

A clear scope, tailored to your equipment and property.

01

Check the space & connections

Appliance dimensions, access and existing power, water and drainage points are checked against the manufacturer’s requirements.

02

Position & set up

Suitable appliances are positioned and levelled. Washing machine transit bolts are removed where applicable, with hoses connected to compatible existing fittings.

03

Test & explain

We check for visible leaks and run an appropriate function check. You get a straightforward explanation of the setup before handover.

Before you book

Useful answers.

Ask about your installation ↗︎
Which appliances can you install?

Washing machines and suitable plug-in appliances are considered individually. Send the make, model and photos of the installation space to confirm scope.

Does this include plumbing or electrical alterations?

No. New or altered water, drainage, gas or electrical services must be handled by an appropriately licensed trade. This service uses suitable existing connections only.

Can you stack a dryer?

Send both appliance models and details of the manufacturer-approved stacking kit. Suitability, access and any additional lifting assistance need to be confirmed first.

Do you remove the old appliance?

Removal and disposal are not included unless specifically agreed in the quote.

What should I photograph?

The appliance, access route, installation space and existing taps, drain and power outlet. Include model numbers and your suburb.

Washing machine installation in Byford, Armadale and Perth

Request a quote for a washing machine or suitable plug-in appliance using existing compatible connections. Include your suburb, make and model, and photographs of the space, taps, drainage point and power outlet. This helps confirm access and whether the proposed setup is within the service.

Preparing for appliance installation

Check that the appliance can fit through the access route and into its intended space. Let Gary know about steps, tight corners, stacking or an old appliance still in place. Keep the manufacturer instructions and any supplied fittings available. New plumbing, gas work and electrical alterations are not included. Removal, disposal, stacking equipment and additional lifting assistance must be discussed before booking.

Installations start 5 October 2026. Enquiries are welcome now; dates and scope are confirmed individually.

Check our service areas ↗︎

Let’s get it installed

Let’s plan your
installation.

Request a quote
Call GaryGet a quote ↗︎